Files
claw-email/.codex/skills/validate-issue/SKILL.md
T
2026-04-29 00:38:11 +07:00

78 lines
2.4 KiB
Markdown

---
name: validate-issue
description: Phase 1 skill. Use when a Gitea issue is created or updated and needs requirement validation. Analyze, clarify, and lock scope as Product Owner. Do NOT implement.
---
# Validate Issue
**Phase:** 1 — Requirement Refinement
**Role:** Product Owner
## When to invoke
- User says: "check issue #X", "validate issue #X", "/validate-issue #X"
- A new issue is created or an existing issue is updated with new information.
## Prerequisite
- Issue exists on Gitea.
## Workflow
1. **Load issue**
- Read issue: `mcp__gitea__.issue_read` (`method: "get"`).
- Read comments: `mcp__gitea__.issue_read` (`method: "get_comments"`).
2. **Analyze**
- Is the problem statement clear?
- Is the scope well-defined or too broad?
- Is it technically feasible?
- What acceptance criteria will prove the change is done?
- Will the change require docs updates or a durable ADR?
- If needed, read relevant code: `mcp__gitea__.get_file_contents`.
3. **Decide**
- **Unclear or incomplete:**
- Post clarifying questions: `mcp__gitea__.issue_write` (`method: "add_comment"`).
- Stop. Wait for user to respond, then re-run this skill.
- **Clear and feasible:**
- Post Final Requirements (see format below) with specific acceptance criteria.
- State whether docs updates are expected.
- State whether an ADR is required, recommended, or not needed.
- If ADR is `required` or `recommended`, tell the Developer to use `create-adr` during implementation.
- This locks the scope and signals Phase 2 can begin.
## Final Requirements format
```
## Final Requirements
**Summary:** <one-line summary>
**Scope:**
- <requirement 1>
- <requirement 2>
**Out of scope:**
- <explicitly excluded items>
**Acceptance criteria:**
- <verifiable check 1>
- <verifiable check 2>
**Documentation impact:**
- <README.md / .env.example updates required or not required>
**ADR:**
- <required / recommended / not needed, with one-line reason>
```
## Rules
- Use Gitea MCP tools for all operations.
- Do NOT write code, create branches, or create PRs.
- Make acceptance criteria specific enough that Dev and Reviewer can verify Definition of Done without guessing.
- Do NOT proceed to Phase 2 — that is a separate skill.
## Next skill
After Final Requirements are posted, the user invokes `/implement-task <issue-id>` on the Developer agent.